Regularly assessing the condition of the cables can prevent a large number of failures in your wind farm.
YOUR ADVANTAGES
Through a quality follow-up during construction, effective asset management during operation, and OEM independent advice, you can prevent production losses & asset downtime as much as possible.
WHAT WE WILL DO FOR YOU
Laborelec assesses the condition of all types of cables:
- On-site electrical measurements (insulation resistance, tan δ, TDR, partial discharge, interpretation of DTS measurements,…).
- Cable fault localization on MV and LV cables.
In case of a damaged cable, junction, or termination, Laborelec proposes to perform the RCA in our cable laboratory:
- Visual inspection.
- Microscopy analysis.
- Advanced material laboratory tests.
- Evaluation of the best solution: repair or replace.