Skip to content

Regularly assessing the condition of the cables can prevent a large number of failures in your wind farm.

YOUR ADVANTAGES

Through a quality follow-up during construction, effective asset management during operation, and OEM independent advice, you can prevent production losses & asset downtime as much as possible.

WHAT WE WILL DO FOR YOU

Laborelec assesses the condition of all types of cables:
  • On-site electrical measurements (insulation resistance, tan δ, TDR, partial discharge, interpretation of DTS measurements,…).
  • Cable fault localization on MV and LV cables.
In case of a damaged cable, junction, or termination, Laborelec proposes to perform the RCA in our cable laboratory:
  • Visual inspection.
  • Microscopy analysis.
  • Advanced material laboratory tests.
  • Evaluation of the best solution: repair or replace.
Back To Top